Peljesac Bridge
A 2.4 kilometre bridge opened in 2022 that finally joined Dubrovnik to the rest of Croatia by road.
Saved in this browser only - no account, nothing sent anywhere. See your map
Until 2022 the only road from the rest of Croatia to Dubrovnik ran through about nine kilometres of Bosnian territory at Neum, which meant border checks in both directions and, after Croatia joined the European Union, an external frontier cutting the country in two. The bridge fixes that: 2,404 metres across the Mali Ston bay between Komarna and the Peljesac peninsula, on six spans carried by pylons standing in soft seabed that required piles driven very deep. It was built by a Chinese consortium with most of the cost met from European Union funds and opened in July 2022, and the drive south is now continuous.
What you actually see
- A 2,404 metre crossing - between the mainland and Peljesac.
- The Neum problem solved - no more border checks to reach Dubrovnik.
- Deep piles in soft seabed - the engineering the site demanded.
- Opened in July 2022 - largely funded by the European Union.
When to go
Year round; the viewpoints at either end are always open. An hour.
Honest expectations
There is nowhere to stop on the bridge itself - viewing means the laybys and villages at either end. It is a piece of infrastructure, not a monument, and ten minutes covers looking at it. The road it feeds is busy in summer.
Nearby
Ston and its walls are along the peninsula; the Neretva delta is north.